Momentum Modbus Plus 170 PNT Series Guide de l'utilisateur Page 274

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 373
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 273
Configuring an M1 CPU with Concept
262
870 USE 101 00 V.2.2
Reserving and Monitoring a Battery Coil
Introduction
Since the Option Adapter does not have an LED to indicate when the battery is low,
we recommend that you reserve a 0
x
reference to monitor the health of the battery.
This section describes how to reserve and monitor a battery coil, using the Specials
dialog box in Concept 2.1.
Reserving a
Battery Coil
From the PLC Configuration screen, perform the steps in the following table to
reserve a battery coil.
Continued on next page
Step Action
1 From the Configure menu, select
Specials...
OR double-click on any field in the
Specials region of the dialog box.
Result:
The Specials dialog box appears.
Vue de la page 273
1 2 ... 269 270 271 272 273 274 275 276 277 278 279 ... 372 373

Commentaires sur ces manuels

Pas de commentaire